SHOP PRODUCTS
Houzz Logo Print
michael_batelaan

poor tile work in bathroom, what to do at this point.

Michael Batelaan
4 months ago

I had the bathtub set, duraguard and red guard applied, everything looked great until the contractor started applying the 12X12 tiles, take a look at the progression. I am really concerned about the gap between the wall and tile especially the taper as the tiles go up. The level shows level on the tiles and ever so slightly tapered on the wall. Just looks like a total botched job, any comments would be welcome.

Comments (14)