We are closing in 2 days but we are having issues with the builder not placing the A/C unit in the agreed upon place according to the lot plan/contract that we signed.




We plan to have a patio and what I had in mind was when you exit that sliding door, grill would be on the left (gas attachment is there) and seating are to the right


(Lot plan that I signed, I added the grill, table & chair drawing)




The builder placed the A/C unit where I was planning to have my seating area. I pointed out during the initial walkthrough the issue but now, 2 days before the closing they said that they can't move it. I am thinking that they don't want to do it because it would cost them a lot to reroute the wire and copper pipes to put it in the original spot.


This may delay our closing since it is in 2 days and we have our final walkthrough tomorrow to do a signoff on the property. But I don't want to signoff on the property when they didn't place the A/C unit in the correct spot.


What options do I have at this point so close to closing?


Thanks!