Would you insist on paying?

6 years ago
last modified: 6 years ago

The contractor came by today to talk about the roof on my new porch. Apparently there was a misunderstanding about the roof pitch. It was supposed to be a flat roof with rubber on it. Shingles aren't good for flat roofs, apparently and it wouldn't have been seen from the ground so didn't have to look nice. The work crew built a massive roof with a higher pitch to it, making it more expensive for the company. Now the eaves of the roof have to have siding put on them because they are so big. Before they were going to put some other material (can't remember now) but I chose black to blend in with the roof. So, I had to pick the siding color today.

He was pointing out that they always have extra material pointing to the leftover Trex but the work crew ordered more material than they ordered because they needed more. I asked what they were going to do with the leftover TREX and he told me "throw them away". I asked if they could build a one-step, step-down because it was too high for my short legs in two places. I meant that I would pay for labor but he said he would include it in the cost I was already paying because they messed up on the roof. I'm actually getting a better, bigger roof and don't feel like it's right for them to have to eat the labor cost of the steps. They're already having to order more material for the bigger roof and more actual roofing shingles since it can now be seen from the ground and I didn't want rubber showing. I'm not paying for any of that because they are the ones that messed that up. I still feel bad about the steps. What would you do?

Comments (20)

Sponsored
Haus Studio
Average rating: 4.8 out of 5 stars28 Reviews
Franklin County's Preferred Custom Cabinetry & Design Studio