SHOP PRODUCTS
Houzz Logo Print
rudyfl

Subfloor prep for hardwood installation

rudyfl
15 years ago

We had added addition for master bedroom and plan to put new hardwood floor for it. But we have some problems to prepare the subfloor. The subfloor contains old plank subfloor from old house portion and new plywood subfloor from new addition. There is about ¾" wide and 15" long gap between old and new subfloor (see picture). Because we donÂt want to put another layer of plywood on top of it that will create level change between master bedroom and master bathroom as well as the rest of the house. What is the way to fix this gap? My contractor told us that just use floor patch to fill it. Is this will create problem for a long run? Or should we cut some edge of plank subfloor out and then use plywood to patch it?

{{gwi:1536187}}

{{gwi:1536190}}

Comments (6)