SHOP PRODUCTS
Houzz Logo Print
vitamine_gw

help on tile!! should we insist on a redo?

13 years ago

Contractor just finished setting the shower/bathtub surround tiles today. Grout job is tomorrow. Need your help in deciding whether the tile job is acceptable. And if not, what to do about it.

Tile issues: Some vertical seams not aligned. Some tiles stick out further. See link to photos below.

The contractor had pointed out that our walls (circa 1960's) are not ideal/flat due to the studs/framing. This is the cause of the tiles bulging out in various places. The contractor has tried to float tiles to make them flat.

The contractor mentioned that -- because of choice of thinset -- to redo these tiles, you'd have to take off the entire wall including the backerboard.

Is this common or are we being too critical?

Should we insist on having the contractor redo the tile job?

Here is a link that might be useful: Bathroom Tile

Comments (4)