SHOP PRODUCTS
Houzz Logo Print
threedgrad

Master bedroom and bath in progress

threedgrad
15 years ago

Well, I finally got my door headboard up with the help of a friend. The metal bracket on left side is to hold my swing lamp but I misplaced the little black screw on things to hold the lamp in place. I will have to see if I can get some at the hardware store. Once I hang the swing lamp the table lamp will go elsewhere. One day I will need to get a king size comforter. I like all cotton with no pattern.

This is a shot of the left side of the master vanity. This place has toilet and shower in a room with a door and vanity is not enclosed.

Comments (3)