16 years ago

I have a new construction house and I am planning Glueing down 5" reclaimed antique heart pine wood floors. I am getting mixed recommendations on acclimation. I am being told by my GC that it is almost impossible to have the AC running so early in the build process. He always installs glue down real wood floors right after sheetrock with no acclimation with no problems. Even the floor guys I have talked to say they seldom acclimate the flooring due to timing problems with the subs. I had always thought I would need to acclimate the floors with the AC running before installation. Anybody have any thoughts?