SHOP PRODUCTS
Houzz Logo Print
mlraff53

How long should I let my floor dry before new floor?

15 years ago

Hi all,

We had some water damage upstairs. Toilet overflowed and water came through the ceiling downstairs. Luckily we were home and cleaned everything up.

I actually had carpeting in the bathroom/hallway and we pulled it up. The bathroom also had vinyl underneath (which I think made matters worse). We are going to put Allure vinyl planks from HD (Hickory). How long should I wait to make sure everything is dry. The plywood looks dry now but I don't know about underneath. It's been 4 days.

One week, two weeks or longer?

Comment (1)