How long should deck mud dry before tiling?

mrao77
13 years ago

We are having a shower pan built (deck mud, preslope,membrane, more mud to slope) and putting on a layer of Redgard for water proofing. Then tile and grout.

Can the pros please give me a time line of how long we need to wait in between each step, so tha the mud cures completly and we dont have issues later with tile popping up?

In another bath upstairs, the floor was tiled (over backerboard) and grouted (using grout Admix according to directions) the day after. A few tiles popped up and grout cracked. They were removed and replaced. Now the neighboring tiles are poping up a little. What could be causing this?

Bill, mongoct..please advice :)