SHOP PRODUCTS
Houzz Logo Print
webuser_731704559

How is my tile job going?

HU-731704559
2 years ago
last modified: 2 years ago

I am tiling our newly renovated bathroom. We had to totally gut our master bathroom as the last owners left us with a terrible shower job that ended up with mold ever where. We had to remove everything down to the studs. I also moved the shower drain and toilet drain along with running new water lines (Pex) and redoing most of the electrical as it was not done right and was a HUGE hazard. Me and my wife have done ALL the work and are worried about the tiling so far. Please let me know what you think. We used 1/16 spacers only to realize 4 rows up - subway tile naturally has 1/16 spacing built in. So we are basically 1/8 spaced, ugh. Please tell me what you think...That is cement board. I taped and thinset the seams. Then painted on aquadefense - water proof membrane.


Comments (20)