Houzz Logo Print
hzdeleted_21902377

The new renters are moving in Sunday......

9 years ago

The kitchen was our last "project", The house is ready!

Kitchen before: 7' high ceilings(lowest ceiling that is legal), had an uncapped unused dishwasher p-trap that smelled like sewage, a missing cabinet next to the frig where they "had" a trash compactor. Electric was NOT grounded. Outside pipes by sink freeze when it's cold for any length of time. After all that....we gutted it. There were 2 broken support beams and various support problems we found & fixed.

Before:


After:

12' high ceilings, LED lights...

42" High cabinets, crown molding, counter depth frig., pantry...

Planning desk or student study desk or rolling out pie dough area....


Comments (33)