Long, but need help with bathroom quote (xpost)

akl_vdb
7 years ago

We're redoing the ensuite hopefully.

We had 2 companies come by last week and received 1 quote :-(

This was one. It seems pretty encompassing, but can someone look it over with different eyes and tell me what's missing?

It is just a labour quote. So all materials are extra. We are keeping
the same layout essentially, just making the 5ft closet door entry
smaller and perhaps adding a pony wall to separate the toilet.

If anyone makes it through it, thank you!

Main floor bathroom renovation:(approc floor measurements are 98" x
116" x 96" ceiling height) (will remove all parts of bathroom)

-frame and install recessed shower storage niche into interior wall
-install 36" x36" acrylic shower base into concrete leveling pad
-replace existing shower faucets with temperature and pressure balanced unit complete with rainshower and slidebar
-install 1/2" KerdiBoard on all shower walls to ceiling level
-apply Hydroban waterproofing membrane to all joints and corners
-install ceramic wall tile in shower area complete and as wainscotting behind freestanding tub area
-install Schluter Rondec metal profile on all exposed tile edges and around the perimeter of niche
-install 36" shower door with 36" glass return panel
-caulk and seal shower unit as required
-install freestanding soaker tub complete with deck mount faucets
-install waste and overflow and reconfigure drain as required
-grout all cermaic tile with high performance Prism grout
-install new vanity complete with solid surface top
-install dual basin sinks complete with Dahl fixture water valves,basin faucets and mechanical drain assemblies
-remove existing wall mounted mirrors and install new framed mirror
-add 2nd GFCI outlet over vanity and replace existing outlet
-construct pony wall to left of toilet (possibly cap with Quartz from countertop)
-replace existing toilet with 12"RO toilet complete with Dahl fixture valve and braided flex suplies
-relocate existing 120V dedicated 15amp circuit for tub and use for in floor heat
-install Ditra Heat crack isolation membrane over existing subfloor
-install 120V Warmwire electric radiant heat wire complete with in floor temperature probe
-install touchscreen programmable wall mounted thermostat
-install ceramic floor tile complete with tile baseboard capped with Schluter Rondec metal profile
-install transition strip at doorway
-replace existing pocket door into bedroom with new 2 panel pocket door
-resize existing closet opening to 30" and install barn door complete with all required hardware and trim
-replace all door casings inside bathroom and on exterior of bedroom door
-replace existing vanity bar light with new fixture
-patch all walls and ceiling as required
-apply 2 coats Benjamin Moore Aura Bath and Spa paint to all walls and ceiling as required
-install all towel bars and toilet roll holders as required



What do you think? Thank you!!!