SHOP PRODUCTS
Houzz Logo Print
gaylemh_gw

Question for any kitchen designers out there

15 years ago

Hi,

My cabinets were delivered yesterday. The refrigerator end panels were supposed to be 30" so they could be cut down to 25". The company delivered the wrong panels 24". I believe they are 3/4" thick.

The contractor will be installing the cabinets on Monday.

If he brings the cabinet over the refrigerator to 25" deep with the 24" panels, is there any kind of 1" trim that could be put at the front edge of the panel to make it 25" and still look alright.

They are willing to send the 30" panels but it will take a couple of weeks. My contractor will be starting a big job after this week, and really wants to have my kitchen finished, by the end of the week

I need to let him know what I want to do.

Thanks

Comments (13)