POOL SPECIFICATIONS:

675 SF surface area

120 LF pool perimeter

40ft long x 18/22ft wide free form

7.75 Spa raise 48" w/6 ft. spillover, 10 jets

Double cantilever cap or flagstone on spa- undecided

Canitlever coping or flagstone coping for pool- undecided

3 1/2 shallow to 7ft deep

48" raised bond beam 14ft long

2 30" rasied bond beams 12ft long

162 linear ft. raised bond beam surface area finished in a Combination of bouquet canyon and stacked stone

5ft high grotto with water fall feature on top

Split sheer descent waterfalls from grotto roof to pool

3 ft high water fall feature into spa

10 tons of sierra boulder rockwork for water features

800 sq ft stamped concrete decking

9 ft. caribbean shelf

Pebblesheen of undecided color

Stub for Solar- I won't be able to afford it this year unless I DIY.

EQUIPMENT LIST:

Filter pump: Pentair Intelliflow VF

Water fall pump: Pentair Intelliflow VF

Spa pump: Sta-Rite 3 hp

Cleaner pump: Polaris 3/4 booster pump

Celaner: Polaris 280 auto pool cleaner

Spa blower: Polaris 2 hp QT

Filter: PentairTR 140 Triton/ or cartridge instead

Heater: Petair 400k max-e-therm

Salt: Pentair intellichlor salt generator

AUTOMATION:

Pentair Easy touch 8

Pentair iS10 spa side remote

Any vendors want to help me with placing a LARGE order?

PLUMBING:

Pool return: 2in 52gpm @ 5 fps

Pool skimmer: 2in 52gpm @ 5 fps

Main Drain: 2.5in 75gpm @ 5 fps

Spa return: 3in 112gpm @ 5 fps

Hot return: 2.5in 75gpm @ 5 fps

Spa drain: 3in 112gpm @ 5 fps

LIGHTING:

3 pentair 150w SAMS

1 pentair 150x 12v SAM

Pentair PG 2000 Illuminator

So I think that covers it. It has taken me almost 3 months to get to this point. I don't care if you are a newbie, vendor, an owner/builder like me, or an experienced pool builder, I would love your feedback/comments on:

1. Design and choice of finishes for pool/decking/features

2. Plumbing efficiency

3. Equipment choice and maybe how to get it a little cheaper- I am WAY over budget.

Feel free to compliment or criticize anything you want. I don't take anything personally. Doing an owner/build, I have gotten this far by listening to a lot of input and trying to make the best decisions from all the information.

Plans are submitted to the city and I have recieved multiple estimates for excavation, steel, gunite, and decking. Still waiting on the other estimates. Excavation tentatively set for May 10, 2009.

Questions, comments, and feedback begins...............now!