SHOP PRODUCTS
Houzz Logo Print
kathy_wa

Connecting 1/2' supply to 3/4' valves?

kathy_wa
15 years ago

I'm finally doing my MBath - it has the usual 1/2" supply lines roughed in to the shower area. I bought 3/4" valves which will go to 1/2" showerheads.

My question is: do I just convert ONCE from 1/2" to 3/4" supply lines before the 1st valve (thermostatic mixer) continuing to use 3/4" supply for the rest or do I run 1/2" supply between each 3/4" valve?

So just to outline the full scenario, we have:

A. 1/2" rough-in supplies ->

B. 3/4" thermostatic mixer ->

C. 3/4" volume control ->

D. 3/4" diverter ->

E. 1/2" fixtures (1 ceiling mounted showerhead, 1 handshower, 2-1gpm body sprays)

The diverter can run one, or any TWO functions at one time - not all 3 at one time.

I did post this on another forum, but didn't yet get a definitive answer. Returning these 3/4" valves for 1/2" is not an option.

So I am hoping for some help here! :)

Comments (3)