kahlanne_gw

Before I start...Want to get it right

kahlanne
14 years ago

We hired a highly recommended tile guy for our last bath remodel and after reading on this site, it seems he didn't do everything correctly. He installed hardibacker but no moisture barrier of any kind behind the tile or hardibacker. Hoping for the best since the shower is seldom used in there.

With our new remodel, another highly recommended tile guy put up greenboard around our tub/shower area. He was working under our terrific general contractor who made him remove it. One thing led to another and in the end, dh is finishing the room.

Now we want to make sure he gets it right. He has tiling experience but limited to non-wet areas. Anyway, the tile guy removed the greenboard before leaving. However there is one foot of regular drywall near the ceiling. It is above the showerhead. Dh purchased enough hardibacker to replace the greenboard. Should we replace the drywall area too? We are not planning on tiling all the way to the ceiling. We are stopping where the drywall starts anyway.

When installing the board, what kind of moisture barrier, etc should we use? Two of the walls are exterior walls. Does this go under the hardibacker? When installing the hardibacker and taping the seams, dh used modified thinset over the top of the seams, correct?

Oh, when installing the hardibacker, what do you do around the tub flange? Does the hardibacker go behind the flange, in front of it, setting on the tub? What about the barrier?

Once the hardibacker and barrier is done, then you tile as usual, correct? Anything else we should know? We will not have any niches but do have a couple of premade corner shower shelve inserts. Any tips on installing them?

Thanks so much for the help.

Comments (4)