SHOP PRODUCTS
Houzz Logo Print
psilva81

Subfloor repair question

psilva81
4 years ago

Repairing a 5x10 bathroom due to water damage. All flooring and drywall removed to include 5/8" subfloor over 16oc joists. outside the bathroom we have 1/2" engineered wood installed over 3/4" hardwood. My question is: Do I install new 5/8" subfloor glued and screwed into joists and then the 3/4" (to make up for difference in flooring height) or should I put the 3/4" first and then the 5/8" over it?? also, does the top layer need to be screwed into the joists as well?


Thank you.

Comment (1)