T1-11 siding has z-flashing between 8 foot panels when installed (greater than 8 foot height, requiring more than one panel vertically).

My question is should the outside of the top of the z-flashing be caulked to the bottom of the T1-11 panel above it? Or does this small horizontal crack need to remain open? I'm getting rust coming out of that small space between the top of the z-flashing and the panel above it, and wonder if that small space could be or should be caulked closed so that rain doesn't drive into the space and cause rusting?

The rust is pretty unsightly, as you might imagine, but I don't know if that small horizontal space needs to stay open or not.