SHOP PRODUCTS
Houzz Logo Print
thefed17

Hired a guy to do a shower stall...I think I'm being ripped off..

thefed17
15 years ago

I hired a referred floor guy to do my shower stall...new construction over an acryllic base. He put 1/2" cement board over the studs. Did not tape the cement board seams. Did not put up a membrane. Used Laticrete mastic to hang the tile.

He hasn't grouted yet, and I'm considering stopping him now after researching his methods.

What should I do???

Comments (7)