mrmichaeljmoore

Basement Bathroom Tiling Installation Questions

14 years ago

I am having a full basement bathroom installed and just wanted to ask a few questions regarding tile installation.

Half of the basement is already finished. So, we will be breaking through the wall that separates the finished from the unfinished side and adding a bathroom there.

My friend is a contractor who is doing the work, including tiling (except electrical and plumbing).

Here is his plan he gave me for the tile installation.

He said he and his guys are good a the tile work and he even offered to show me jobs he has completed....

Floor:

2x4 sleepers to get the bathroom level with current finished area

Plywood subfloor (not exactly sure how thick the floor or plywood is)

Plywood screwed down (apparently he said they use a lot of screws to secure the plywood)

Thinset and Ceramic Tile over plywood floor

Shower:

Swanstone shower base (bulit up on same sleepers and plywood as rest of bathroom floor)

Quikcrete Sand topping mix under Swanstone base for support

Durarock walls

Thinset

Ceramic Tile

NOTE: 2 of the 3 shower walls will be exposed on the backside. The third wall will be the inside wall of an adjoining closet.

Does everything look ok with this?

He said this is his typical process and hasn't had any problems with it.

If more info is needed, please let me know and I wil provide.

Thanks.