bridgecross

Changing contractors mid-stream?

bridgecross
13 years ago

Anybody have experience (good/bad) changing GCs in the middle of a job?

I'm doing a small bath, 5x8, a complete teardown. The CG did all the rough work so far, and my town did the rough inspection. Then after putting up the drywall, the contractor tells me that the electric inspection was never done. The electrician is insisting that the drywall and insulation come down to do the inspection (thank goodness the tile hasn't gone up yet!). We would have to expose one wall and the ceiling. The GC is balking at the doing the extra labor of taking down then reinstalling the drywall, and he's keeping me twisting while he researches alternatives. I think he can take down the drywall sheets intact then put them right back after the inspection.

So now I'm thinking of calling another GC to get a quote on finishing the job. The first guy has about 65% of the money so far, so that's my budget to finish. But I'm concerned that I'll have to pay town fees all over again, plus get out of my contract with the first guy.

Any thoughts?

Comments (4)