SHOP PRODUCTS
Houzz Logo Print
mgregroup

Sticker Shock, or Why I Decided to DIY

mgregroup
13 years ago

Hi guys.

New here, sort of -- been lurking for some while. We are one week out from moving to our new old 1955 low-slung rambler that needs massive cosmetics (read: kitchen and every bathroom). Here's the shorter story:

Master bath remodel comes first, since there is currently a pan leak with rotted floor joists. Ew. Anyhow, I did the right thing and got an architect to draw plans and met with three contractors and chose my favorite. I gave them a $30k budget, although I actually had $35k set aside. The space is *maybe* 300 SF including closet, so its not a huge space. Probably actually much less. Anyway, after months of working with them, they finally came back to me last week with a bid: $50k. I fired them on the spot.

So, now I'm leaning towards DIY. My husband is reasonably handy and we have handy friends, so...

Where do I start now? I have plans and I have some fixtures/tile chosen. I have the money. I have the impetus. But I have no direction.

Help!

Signed,

Master Bath-less in Dallas

Comments (10)