SHOP PRODUCTS
Houzz Logo Print
lizzy_410

July 2023 - How is your build going?

Liz888
10 months ago
last modified: 9 months ago

Whether you are in the building, planning, or just-plain-dreaming-about it phases of home construction, this is the place for you! We are a kind group who share the joys and stresses, the mistakes and successes of this wondrous process.

Welcome! Glad you are here. (PS. We love pictures.)

Comments (118)

  • Liz888
    Original Author
    9 months ago
    last modified: 9 months ago

    @chicagoans - thanks for the island tip! We are doing ledge on each side of the island so I'm not sure if we need that steel for support but will ask!

    @2rickies - agree with @Keen B, it's very interesting, I can't wait to watch your progress!

    After framing & window has been completed, I feel like our build process is a bit slower now. We are working on plumbing rough ins, HVAC and installing electrical plates/backings (I don't know what they are called). Also got cabinet field measure done. Still looking at countertops - having the hardest time deciding which one. Tiles are another story! Geez - so many option, can't choose. lol

    Family Room - rear view. will have bifold doors installed here with covered balcony


    Windows are installed. Hard to tell since they are black.



  • Laurel C
    9 months ago

    @Liz888 those huge doors are going to be awesome! I think the only way we managed to pick tile was going to the discount place with limited selection. I'm a little worried about picking out a tile for our backsplash once the counters go in. All of the rough-ins take a while and it doesn't look like big progress is really happening, which can be frustrating.


    Our counters are supposed to go in on Tuesday, waiting for confirmation that the slabs have arrived at our fabricator's place before hitting send on the email to the plumber, I'm dying to get the dishwasher functional. My mom is coming to visit next weekend also, so it would be nice to have the kitchen fully functional by that point. We have a lot of organizing to do, and need to attempt to get my husband's hobby room sorted as it's doubling as our spare bedroom. Still not sure what we are going to do about maybe having a permanent vs temporary guest bed. A twin sized day bed would be fine for my mom and dad as they visit separately, but won't work for my in-laws, and they often come with a third person who will be using our air mattress. At least we have until autumn to figure that part out.

  • Related Discussions

    It's July- How is your build progressing?

    Q

    Comments (78)
    Sorry to get back to you late... been on a small vacation The shower wall shown in the pic is 6'L x 6'H. Add an extra 2' of tile to the side and ON the side of the closet (it's just out of frame on the right). The shower is 4' wide. The tile guys did a great job with the floor, so all of the water goes to the drain, no matter where its splashed too. I'm 6' 2" tall have had no problem with any water splashing out onto the floor. I thought my wife was crazy not to have a door, but it has worked out just fine.
    ...See More

    It's July- How is your build progressing?

    Q

    Comments (57)
    Thanks for the nice comments. We are happy with how the cabinets are coming out & are busy trying to decide on a granite color and a kitchen table (wood, black, painted finish). If anyone had any suggestions, I'd love to hear them :) Ramor- our installer was just complaining about the hood-- he says that he can't finish it until the vent a hood is in otherwise he will have no access. Sounds similar to your experience-- definitely a mistake on wellborn's part so I am keeping my fingers crossed that it all works out. What color/finish did you go with? I'd love to see pictures of your cabinets if you get a chance. pps7- No texan in this family but definitely a die-hard cowboy fan :) Somehow he has even managed to turn our kids into Dallas fans. Luckily we all agree on the Yankees and besides, I love how the navy blue color looks in the space! littlewomen- post pictures if you can! I'd love to see what you picked and am happy to hear that you are pleased with the quality of wellborn.
    ...See More

    It's July 2017 - How is your build progressing?

    Q

    Comments (176)
    Great to see so much progress for everyone. I can't believe how fast some of your houses are going up! We have most of the exterior painted with the exception of the still-under-construction porch columns. It's nice to finally see the final look of the house. Coffer ceiling and paneling in the great room is completed with the exception of a few pieces of curved trim. The Rotunda paneling is almost complete and the floor border is in place on the second floor. Railing is sitting nearby so maybe we'll see that installed soon? The tin ceiling was installed in the rotunda, but we're not sure we like the finish. They powder coated it, but we were expecting it to be a bit shinier. Might experiment with removing some of the powder coat or hitting it with a gloss coat. After losing our awesome tile guy to the INS tile installation is back on track all around the house. We're probably looking at tile completion in a couple weeks, pending counter tops. Front wrap around porch is completed and awaiting railing. Back porch/gazebo will get its bluestone in the next two weeks and railing at the same time as the front. I think we're still targeting an August completion and hopefully a September COO and move in. I can't wait to start a post about our three year ordeal so you can learn from our mistakes!
    ...See More

    Show Us Your Landscape and Garden Photos - July 2023

    Q

    Comments (13)
    PM, you remind me that I forgot to take pictures of Penstamon digitalis ‘Mystica ’. I grew it from seed two years ago and it has been so much more hardy and beautiful than I had thought it would. Here it is at the end of its bloom. It certainly survived last year with flying colors. We’ll see how it does if this year continues to be soggy. Right now this spot is a ”where am I going to put this” spot. I need to figure out a place to put that will really highlight how nice it is. PM, two shots of Lauren’s Grape, mostly self-sown. She’s dependable, I’d say! Silene armeria, Sweet William Catchfly, is a favorite reseeder. The flowers are beautiful, but the best thing is how it cooperates with neighbors. You can see from the second picture that at its base it has almost no clump at all, meaning it can happily sprout up amongst established plants, grow and bloom, and set seed, all while never really bothering or crowding anybody. It is a prolific reseeder, and always very welcome each year. It is a short-lived biennial, so it does not get out of control and reseeding is welcome. Had to go to Bristol, RI, this weekend for a kid’s regatta, and saw these hydrangeas beautifully performing in a decrepit historical building that seems to be about to undergo a historical renovation/rejuvenation. I love how their beauty stands out amongst the decay. Kind of like a picture of how life can be. Also, saw this deliberate planting of Gooseneck loosestrife, laughed, and had to take a picture of how it is now invading the plants next to it and branching out. It’s so deceptively sweet, until it’s not. Again, kind of like a picture of how life can be! Lastly, posted this grouping on Maria’s ”tea” post, but adding it here with the Ladies Mantle addition. Most of these plants are in pots waiting to be put out. Finally decided to use the golden ferns in a summer arrangement with a potting annual that was left over. Then I realized the potting annual was a perfect match for the astile, and the golden fern was a perfect match for the hostas, LM, and Dicentra ’Gold Heart’ foliage. I got a porch arrangement on the cheap for as long as the astilbe blooms, at least!
    ...See More
  • worthy
    9 months ago
    last modified: 9 months ago



    C Smith

    Nice industrial touches in a modernist house!

    We're trying for the same: exposed steel beams, stark steel stairs, some brick interior walls.

    But after 2 1/2 mos. still in the excavation.

    Before it was developed in the 1960s, the neighbourhood was known as "The Wetlands" and subject to regular flooding

    This was going to be a stepped excavation walkup (4' below floor of basement) Instead, as the soil here--largely grey clay--crumbles away, we'll just pour a massive concrete block to provide frost protection and the stairs formed on top of it.

    Last of the water being Shop Vaced out.

    The drainman is using the previous home's still connected sanitary sewer.

    Building footing forms.

    Which now have to be widened after a failed inspection. I had a geo-engineer over who recommended 30 in. wide footings and three lines of re-bar vs. 2 and said that should be OK. (C$977 "savings"--the geo's fee-- that wasn't)

    Hopefully ready to pour in four days. Sunshine predicted for a change! Otherwise back to pumping and vacuuming. Did two days with my son and his gym rat friend. Slept well!

    ***

    Geo just confirmed that the native soil is not suitable for backfill. So all those mountains now inaccessible by a backhoe or front-end loader will have to be removed by mini-loaders through the garage. Then we will shoot in sand and or re-cycled to fill. Say C$30-C$40K+ extra. :-((

  • chicagoans
    9 months ago

    @worthy that’s not my floor! I just used a picture like that to discuss counter overhang support with my builder. I’m a wood flooring fan.

  • worthy
    9 months ago
    last modified: 9 months ago

    ^^^^

    Yes, it was pointed out earlier. Tim and I still like it!

  • agbhw
    9 months ago

    Just had an entire post written and it glitched on me 😫. Ugh! Framing almost done. Need to finish the house upstairs and garage upstairs interior walls, eave returns, and lower shower ceilings. Next up - storm shelter installed in garage floor, gravel fill then concrete can be poured. We STILL haven’t gotten a roof on, waiting for the chimneys to be built. We are having Rumford masonry fireplaces in the dining room and living rooms. Husband hasn’t had the time to order the materials for it yet, so nothing for mason to work with. Hopefully will be done this week. So.. framing finishing, garage floor, fireplaces/chimneys, roof, cornice, porch entablatures, garage siding and house siding, windows.. windows are due to arrive in 4-8 weeks. Amish framers will come back for that, and I’d love to have them a lot to do so they stay for a while again. I’d like to have the windows, cornices, siding, for them to do all together. Now for the pictures. Again. Hope it works

  • agbhw
    9 months ago

    Pics

  • agbhw
    9 months ago

    Pics 1 Garage.
    Pic 2 Upstairs of house 9’ ceilings, no interior walls yet. Will be two bedrooms, one bath, one large extra room.
    Pic 3 upstairs of garage
    Pic 4 favorite view. Out the garage dormer looking out back yard

  • Liz888
    Original Author
    9 months ago

    @laurel - thanks, its nice to hear that this phase feels long. Just thought it was me.

    Anyone using tankless hot water heater? If so, Which one are you thinking of or have installed? Any suggestions?

    We are looking at this one:

    RSC199IP 199,000 BTU Condensing Indoor Tankless Water Heater w/ Pump & Valve Kit

  • 2rickies
    9 months ago

    Loving all these photos! It's exciting to see everyone's projects coming together.


    @Liz888 and @Keen B, I'm just as eager to find out what it will look like! 😂 We went through a few different versions with the architect, and I like what we ended up with (luckily!) but despite having elevations, I sometimes have trouble picturing it. I think the windows will go in this month, at least on the bedroom wing, and that will help. They've been delivered, so it's a matter of the framing being ready.


  • chicagoans
    9 months ago
    last modified: 9 months ago

    (Remodel) Floors have been finished and I love how they turned out! These floors are about half old/existing and half new. (Kitchen was tiled, and FR floors had an extra high subfloor so had to be pulled up and replaced.) I think they did a great job blending in the new with the old floors.

    I didn't turn on any lights, and the floors are actually a bit lighter than what the pictures show.






    I even love the few funky pieces, because to me they show the beauty of natural wood:




    Here's what we used (floors are white oak.) Just one coat of the Bona to avoid getting a grey color.




  • Keen B
    9 months ago

    @chicagoans I love your floors. They look fabulous.

  • chicagoans
    9 months ago

    Thank you @Keen B! I'm really happy with them.

  • Liz888
    Original Author
    9 months ago

    @chicagoans - you floors came out amazing! I love white oak and it looks light and airy! Well done!

  • chicagoans
    9 months ago

    I'm loving seeing pictures of everyone's projects! So many unique and beautiful homes are in progress. They all look amazing and I love that each reflects the visions each of you have for your home.

    As for me, I'm happy to say that I'm no longer topless LOL. Counters went in yesterday - woot! And I have huge respect for the guys who carry, lift, and carefully set down ~900lb pieces of stone!

    Island and cooktop wall:

    Coffee bar (cabinets are still dusty):

    Hearth:

    Main floor PR:

    Lower Level bar (the stone guys were very happy that it's a walkout basement. They had the counter on a rolling cart that they walked down the sloped yard instead of carrying it down the interior stairs.)


    Lower level bath:


  • Laurel C
    9 months ago

    @chicagoans what material is that kitchen counter? It looks great!

  • K V
    9 months ago

    @chicagoans

    Love your lower level bath color scheme. I’m doing something similar but with white tile. What is the name of your paint color?

  • chicagoans
    9 months ago

    @Laurel C: the kitchen counters are a granite called Titanium White. Glad you like them! We had some hiccups with slabs (misplaced, then cracked) so this was the third round, found after visiting 3 stone yards 6 times. I'm really happy with them!

    @K V: Thanks! The paint in the LL bath is Benjamin Moore Buxton Blue HC-149.

  • K H
    9 months ago

    @agbhw It is exciting to see your progress! I remember when you developed your blueprints on here and remember how lovely your floorplan is. So I cant wait to see how everything turns out for you!!

  • K H
    9 months ago
    last modified: 9 months ago

    We have been in our new home for a couple of years now. We finally got the basement finished this winter and now we are starting on the deck. For those that are new; we were in the final steps of finishing our home when covid finally hit our area. We decided to not complete the deck, basement, concrete flatwork, porch brick apron and several builtins because we couldnt get anyone to come out and work on the house at that time. Since we were done spening the big money we couldnt get on the schedules for timely work!! So we went ahead and closed on a great rate. But now we have been saving and cash flowing the remaining items. Which of course costs have gone up tremendously but so have interest rates :( So at least we saved money but it is just a long drawn out process!

  • K H
    9 months ago
    last modified: 9 months ago

    I was wondering what you all have planned for your decking. We have will have a west facing deck 26’ x 16’ I have been getting pricing for composite and pvc but both seem to get pretty warm when I set out samples. But I also dont want to maintain a wood deck!

  • K H
    9 months ago

    Here is our home.


  • Kyla McSweeney
    9 months ago

    So nice KH. We used composite decking for our deck. It does get hot, we have it in our rental. I may end up putting an outdoor rug at the new house. Here is a pic of the back deck at our new house. Front porch is the same material.


  • K V
    9 months ago

    K H

    We used Weardeck sand color on our dock. It stays fairly cool. There are other ”barefoot” colors you might investigate.

  • Laurel C
    9 months ago

    @K H They'll all get hot, especially if you're considering a darker color. IMO, the maintenance free aspect (especially on a deck that gets baked) is well worth it getting hot. IIRC when I was looking at samples, the PVC was a lot lighter, so easier to install and move. You may want to prioritize going for a colorbody type decking, so when the inevitable big scratches happen, the boards are the same color throughout? Wearing clogs or flipflops helps tremendously, as does a rug in the main areas.

  • Buzz Solo in northeast MI
    9 months ago

    @chicagoans, Love your wood floor and your countertops.

    @agbhw you're moving along.

    @worthy I feel for you, that's just lousy about all the extra costs and delay.

    @K H We just used pressure treated lumber for our small front porch and the back deck just ended up being a gravel patio inside 4x4 pressure treated posts with pressure treated stairs down to it.


    As for our HVAC situation, DH has been running the ducts for return air under the floor, he's gotten the run to the 4th bedroom and is close to hooking the 2nd and 3rd bedrooms in but he had to take time off to work on his brother's tractor as DH was the one running it for a mutual neighbor when it broke down so he has been working on that for a few days now. I hope we can get the HVA squared away by November, but he's just one old dude with a bad back and keeps refusing my help! Such a sweetie. It's frustrating not being able to get help!

  • Laurel C
    9 months ago

    Counters are finally in and are (mostly) right! There's a small crack on the long side of the counter where our sink is, I'm hoping they can fill and buff it out (this isn't an area that I foresee getting heavy use, but I do want it fixed) and a line down the middle of the island that we think is from another piece of counter rubbing against this one during transport. Also hoping that one can be buffed out. The bathrooms both look great. I've oiled the kitchen, and it's enhanced the blackness of the stone and I prefer the look, it's absorbed more in the veiny areas, I'll probably pick up some stone wax soon so it doesn't wipe away quite so easily.








    Now it's time to start picking out backsplash tiles for the kitchen. The plumber won't be here to plumb the sinks/dishwasher til Tuesday (so another week of hand-washing dishes in the laundry sink!).

  • CSmith
    9 months ago

    Final inspection day for our CO is today. Wish us luck!Also getting our back patio laid right now. Movers are booked for Monday next week. Have an airBnB lined up because I assume we are gonna fail today, so a back up plan is in place.

    Also making calls today to get a custom chase made for our range hood. Thermador is 10-12 weeks out on those and since it was left off our order, need to find another solution that might be quicker. Have a temp duct on it right now 🥴. Still annoyed that was left off the order.

    Also found out office walls shipped from Italy a few weeks ago. Woot! Hopefully they’ll be here by end of August 🤞.

  • K H
    9 months ago

    Thank everyone for the decking suggestions! I didnt even consider an outdoor rug but that is a great idea. @Buzz Solo in northeast MI that a good option. I tried to get DH on board with a poured patio but he really likes the look of a deck!

  • agbhw
    9 months ago

    Our cornice sample is up! Really a dream come true for me. I joked today that my excitement seeing the sample was only matched by 1 marrying my husband and 2 having our four kids.

  • Chandllerin
    9 months ago

    I’m new to the building process and I’ve found myself watching endless videos on building science. Have any of you spent more than expected on the not so fun stuff (hvac, plumbing, insulation upgrades etc) while cutting costs on the fun/pretty stuff (flooring, appliances, countertops etc)?

    In other news, roof should be done by the end of the week (pic taken before roof work began). My builder just received the CO for his own house so now his full attention can go into our home. As you can see in the pic…Comcast cables are still there.

  • worthy
    9 months ago
    last modified: 9 months ago

    Have any of you spent more than expected on the not so fun stuff...."?

    No end to it!

    C$20,000 on unexpected excavation due to falling clay walls and shoring at C$180 per running foot.

    Now, by rough estimates, another C$40-$50K+ to remove mountains of excavation, which were supposed to be backfill, by a small bobcat through the yet-to-be-built garage and then re-filling with sand, re-cycled material, clear gravel and aggregate #2 depending on the conditions.

    Also endless expensive draining and drying to prepare for the footing pour.

    Ready this morning to pour footings. But the building inspector forgot her early AM appointment. By the time she passed our forms, the concrete was cancelled...and now three days of heavy downpours underway. So back to square one with pumps, Shop Vacs and even coffee cups.

    Plus I will have to argue with the foundation former that you can't simply push the water away with concrete and pretend it's OK because it passed when it was dry!


    Ah, for the good old days when we could have pushed in the excavation and sold the lot to another enterprising individual.

    Absolutely wish I never started. Hope we never have to move in!

    Depressing enough?

    ***

    It's not the added bucks, it's the endless delays. Three months and we're still in the hole!

  • AC M
    9 months ago

    We knocked down a house which we had outgrown after living in it for ten years about 20 years ago. It was a nightmare. I guess, much like one forgets the pain of childbirth and has another baby, we are planning to build again. I have bids in hand, over budget (natch) and have been watching all of the incredible builds on this forum. However, the inevitable frustrating and usually expensive set backs such as you cite Worthy, have me getting cold feet.

  • K H
    9 months ago

    @worthy how frustrating! We spent 15k extra on dirt work as our builder never had backfill, sand, gravel etc... on our bid. Stupidly as first time home builders we didn't even think whether things would be missing on the bid!! We also had a 2 month delay because the ground was so wet you couldn't get a concrete truck in and the dug walls began to cave. So there was also some redo on the digging!

    @ Chandllerin love your home. Is that a Don Gardner design? I also loved his home design.

  • Laurel C
    9 months ago
    last modified: 9 months ago

    @Chandllerin we spent $20k extra on a standing seam metal roof, we did spray foam insulation and our builders spent a lot of time doing details for things to give us better air sealing. We spent extra on a variable speed heat pump for efficiency and bought more expensive windows and doors than we'd have liked. Because of all of those extra expenses, we eliminated the tile floors we wanted through the house and went with LVT, instead of high end appliances, we saved money and went with upper mid range, I wanted soapstone counters, but they were $4k more than granite, so we used granite. The tile in our bathrooms came from a tile discounter but was 1/20 the price of retail. We still came in ~$100k+ over budget.

  • Chandllerin
    9 months ago

    @K H Yes, it was inspired by a Don Gardner design. We had a Designer use The Ezra and The Freya house plans for inspiration and then modified the plans for our needs.


    This is a very interesting process for first time builders. I've learned so much and I am grateful for everyone on Houzz for sharing their journeys. My builder is shocked (and probably annoyed) at the questions that I ask.

  • Chandllerin
    9 months ago

    @Laurel C really helpful. Thank you. Did you have to bring those requests to your builder or was your builder offering up suggestions to make your home more air tight and efficient?


  • Laurel C
    9 months ago

    Part of the reason that we went with the builder we did is because we are on the same page (at least the same chapter) in regards to high performance homes - we are in Kentucky and most of the builders around here are still of the mind that a house "needs to breathe" without the use of air control features like an ERV. Most details weren't even things that were discussed, like sill plate sealing, conditioned crawl space and attic etc, but he did run stuff like zip vs osb sheathing by us, as we were over budget before we even began construction, so everything that was going to cost considerably more ended up being discussed. Our builder is also the architect and designed the entire house custom for us, so changes weren't really issues, and we didn't end up with change orders for anything, we haven't had a contentious relationship with him at all, we know that the places that we overran on the budget there wasn't much to be done about, and the build quality has been so good we are pretty happy.

  • chicagoans
    9 months ago

    @worthy so sorry to hear about all the water and excavation issues! Sounds very challenging and frustrating (not to mention costly.)

    @agbhw I love the way you connected your garage and house with a breezeway; I've always liked that setup.

    @K H gorgeous house and I love the sky in your picture!

    @Laurel C and @CSmith - love your counters! They look great and I'm sure you're so happy with them. And Laurel, I also really dig your island pendants - very MCM vibe.

  • K H
    9 months ago
    last modified: 9 months ago

    @chicagoans thank you! I took that photo that morning. We just happened to have a storm coming through. That is a ribbon cloud that came thru before the storm hit hit.

  • worthy
    9 months ago
    last modified: 9 months ago

    AC M

    I've built more than 20 homes as a licensed builder.

    Excavation is the unknown box of chocolates that Forest Gump talked about. Not helped by bad weather.

    Test borings may have revealed the trouble beneath. But my former architectural technologist said borings could be hit or miss, so I didn't do them. I only spoke with the soils engineer after the footing inspection failure by the building inspector.

    Over the years, this thread has shown some very imaginative homes in beautiful country settings. Nothing out of plan books!

  • Carissa
    9 months ago

    Hi everyone, I’m new here and loving the stories and photos and so sorry to read about the delays and subcontractor woes and mind-boggling extra expenses. (58k *extra* for excavation?! I would cry.)

    This is our first build and we know very little about the process, so I‘m grateful we’ve been this lucky with our builder and foreman. So far things are pretty smooth sailing, theyre great communucators and very reasonable. The only glitch to date is the draftsman forgot to include the tornado shelter in our calculated total square footage, so we weren’t charged $3400 for those 20 square feet (although we did pay for the concrete blocks, etc, summing $9k). What a great mistake! After a 6 week delay, framing began on Monday.


  • Liz888
    Original Author
    9 months ago
    last modified: 9 months ago

    July has flown by already!

    welcome @Chandllerin and @Carissa! Great to have you both.

    @CSmith - loving how your house is coming together! the front door with tall ceiling and windows - so grand! May I ask where you got that copper light fixture? Did you pass your inspection? Keeping my fingers crossed for you!

    @Laurel C - Your countertops are in and looks great! I'm sure if feels good to have your house come together with all your selections - i can't wait for that phase. Have you picked out your backsplash yet? Do you have an ETA on CO?

    @worthy - I can't imagine being in your situation, my heart really goes out to you. I hope you have some ways to reduce stress.

    @agbhw - Your house is coming along -each stage is so exciting! I agree with @chicagoans about the breezeway. I would love to have that in my house if I had enough land space. Always been so envious of others who have that!

    @chicagoans - those countertops look amazing against the white cabinets. Really pops and the veining goes together with the cabinets nicely! How much more work do you have left? Do you have finish date on your reno yet?

    We are also over $100K+ over budget currently and in the interior plumbing rough in/HVAC stage. I see more overage happening throughout my build. The overage is in the non-pretty/design items such as HVAC, Water Tank, Electrical, Plumbing, storm water lines, cabinets, etc. I shifted my mindset to not let these get to me - I would previously have mini heart attacks when these overages occurred but now I say to myself "it is what it is". This post covid environment is definitely unpredictable so trying to make prudent decisions and move forward.

    We are working on HVAC and stuck on how many systems we need for our house. We had originally planned on three systems and HVAC/GC is recommending two. I know nothing about this so I spoke to HVAC friend and he's giving me really good feedback to how to set up our house efficiently - which is different from my GC's HVAC is recommending. My HVAC friend said he would never recommend the configuration that GC's HVAC is recommending.

    This is what makes me so upset. Is my GC looking out for my best interest when these recommendations come in? With my HVAC friends help and configuration, while I know this will increase my HVAC cost, it's worth the investment. Like @Laurel C - i want to make sure we have highly efficient system so I think it's worth spending extra $$ on this.

    Feels like snail pace at this point but will take what I can get!

  • chicagoans
    9 months ago
    last modified: 9 months ago

    @Liz888 "How much more work do you have left? Do you have finish date on your reno yet?" I got an updated construction schedule last week, that shows punch list items starting next week, final inspections the following week, and completion on August 11! Can't get too excited though, because they still need to tile the backsplash, epoxy the garage floor, finish installing plumbing fixtures, putting up lighting and doing trim work.

    Also, our new back door and lower level door went in (yay!) but the new front door was hinged on the wrong side. Stuff like that makes me nuts, but I know it's small beers compared to what many others are going through. Luckily I'm not the one who made that error, but unluckily I have no idea what the lead time will be. (It's from Therma-Tru.)

    So I'm not counting on August 11. I'm having some furniture delivered the third week of August, and now thinking I may need to reschedule that because we don't want it damaged of course. (Ugh - we ordered it in early June.)

  • chicagoans
    9 months ago

    New doors went in last week. Sadly the front door + sidelights are being sent back because the door was hinged on the wrong side. (And that's the door I've been really excited to see!) But I really like how the new doors lighten up the space. These are paintable from Therma-Tru, and insides will be painted to match the interior trim color. Outsides will be painted BM Mystic Lake, which looks really nice with our exterior brick. Exterior handles are black.

    Back door:

    Lower level door (mullions in side windows will be removed):


  • Keen B
    9 months ago
    last modified: 9 months ago

    Hey, Everyone. Hobby Lobby's last day for 50% cabinet knobs and pulls is today (online, and in store.) They have a pretty big stock, with products I see on plenty of other sites for quite a lot less, even without the sale.


    @Liz888 You probably already know the answer to this, but there is some issue with having "overly powerful" A/C, or too many A/C units that designers/installers cannot agree upon. Something about it being so efficient that cooling shuts on and off, cycling too often through the day...Maybe this is the difference in their designs?

    @chicagoans Somehow I missed the breezeway picture, but every other picture I see is wonderful!

  • Keen B
    9 months ago

    We finalized how we want to do the cottage stairs...and lucked out on finding some reclaimed spindles with a design we love. Stairs will be white oak, rails and posts painted a TBD shade of blue.


    Now we are trying to imagine the newel posts, finial and rails. They'll be custom to coordinate (though not match) the balusters. We want newels at least 6 inches thick, round...Any thoughts?





  • Kyla McSweeney
    9 months ago

    @chicagoans I love those doors and the color you are painting the front door. I may consider that Mystic Lake for our bedroom. I really wanted a back door like yours, and it isn't what we ended up with. I am wondering if I complain and make them change it or just suck it up and change it down the line..


    @keenb I really like the spindles.


    We don't have a final decision on our stairs railings etc yet. We haven't gotten pricing for what we what which is either black metal, wire or some such. One of the things I am anxious about. That and the builder wanted to design the shower for us based on one he put in his own house. When we started he called it his "gift" saying they do some sort of project like that for every client, although that was a long time ago, and our issues have cost his extra $ so who knows what is happening now.


    My husband and I just got back from moving all the lighting fixtures, bathroom mirrors, (ones in the primary bath are back lit LED ones) heated towel rack, and kitchen sink to the garage of the new house. It is early and our PM may complain, but we are trying to get stuff out of the rental so we can pack stuff up in the next month. I have one light extra and I am not sure why. I ordered these things well over a year ago and can't return, so I guess I will hang onto it for now, just to make sure we don't need another and then try to sell it or end up donating it. I marked all the boxes with what goes where, which is how I figured I had an extra after comparing with the electrical plan. I do need one more bathroom light fixture. I kind of like this one Kids bathroom light but it is probably too modern for the rest of my design which is more craftman inspired. Hmmm... I can't decide.


    I had a minor hissy fit with the PM and builder this week. They were supposed to start drywalling on Tuesday. Well the blueboard didn't get installed until Friday! They had just ordered it the week before. The PM said it usually only takes 2 days. They had plenty of time and space to get it ordered earlier. It is stuff like this that drives me freaking crazy.

  • Chandllerin
    9 months ago

    If anyone needs a fun break from their own home build, watch Home on Apple TV. It made me really grateful for the privilege of having the means to be able to build a house and make it my home. I also love seeing how other people make their house a home...guess that's why I love Houzz.

  • Liz888
    Original Author
    9 months ago
    last modified: 9 months ago

    @Chandllerin - thanks for the recommendation. I'm going to watch this!


    Well today is last day of July and we move into August tomorrow. The build progress is never fast enough it seems - i'm sure you all can agree and there are so many frustrating aspects to this process and alot of setbacks, cost overruns, etc.

    When I go over to the site, now I only see 1 or 2 people working and progress lately has been slow. There are things that the GC and PM can do to move things along but I feel like they wait til last minute or don't think about it and then when I ask the questions, they act like the delay is my fault. I wish I can start all over with a different GC.

    I'm trying to see how I can start a new month with different perspective? To not let it get to me so much.

    WIshing all of us who are building - more productive month in August, less stress, and ability to enjoy this journey of building our dream home!

    Here's the link for August 2023:

    https://www.houzz.com/discussions/6391642/august-2023-how-is-your-build-going