Payment Schedule for Covered Porch Remodel
numbersjunkie
4 years ago
Featured Answer
Sort by:Oldest
Comments (13)
PPF.
4 years agokudzu9
4 years agolast modified: 4 years agoRelated Discussions
Contractor's Payment Schedule
Comments (12)IMHO, the GC's take should not be included in any draw except the final one. He finishes the work, he gets paid. Not before. And, you should be able to hold back some portion of the final amount until he has filed an "all bills paid affidavit" and enough time has passed that any subcontractors who haven't been paid have come out of the woodwork and demanded payment from you. Lien waivers (releases) are helpful but they won't protect you from a thoroughly dishonest GC who is robbing Peter to pay Paul... especially if you are the last Peter in line and he is desperate for cash and willing to do whatever it takes to get you and your bank to release money to him. When your GC gives you lien waivers from subcontractors, take the time to call up the subcontractors involved and make SURE they actually signed the things, that it was for work done on your house, that the work done is properly described in the release, including the dates of the work. Also, make sure that enough time has passed since the release was signed so that, if the GC's check to the subcontractor bounced, the sub is likely to tell you about it when you call. Ditto on invoices marked "paid." I'm speaking from bitter experience with a thoroughly dishonest GC who gave me fraudulent documents which even my bank accepted. These included lien waivers where the GC had filled in the amounts after the subcontractors had signed them (GC inflated the amounts so he could collect additional money from the bank!). It also included copies of old lien waivers from previous jobs which GC had copied and then changed the address and date on! He also gave us otherwise valid lien waivers from subs to whom he had given rubber checks. And, when all else failed, he created and signed waivers himself covering non-existent sub and then "he didn't understand why the phone number on the waiver was wrong." He also gave me paid invoices that, upon investigation, turned out to be for materials that were delivered to and used in another house he was building at the same time. Still others invoices were ones where he had xeroxed the originals then changed the amounts. And, on others, he made copies of valid payment invoices then stamped "paid" on them himself! Don't count on your bank to make sure that your payments don't get ahead of the work either. My bank used a form that set completion percentages for various items, but the form had no line item for things like my elevator (which was 5% of the total cost) and did not take into account my extensive decks and porches (which will run nearly 10%) of the total. Because those items which were at the back end of the build weren't even taken into consideration, even the bank's percentages were "front weighted." After OVERPAYING my GC for the work done, I got hit with lien waivers from subcontractors who basically said - and rightly so - "look, I don't care if you have a lien waiver signed by Mr. A that supposedly covers the painting done on your house, I'm Mr. B and I painted your house and I haven't been paid and I can prove it - so if your GC won't pay me, you owe me." We fired the GC midway thru our build but we are still in the midst of the lawsuit we had to file to try and get him to release the M&M lien he holds. And would you believe, he is trying to extort additional money from us to provide that release??? Apparently his lawyer's theory is that we will run out of money/energy for the fight and will pay our GC off just to get him to go away. What you REALLY need from your GC is a performance bond (i.e., insurance that he will finish the job to the specifications of the contract) but such bonds don't come cheap and the builder will expect to pass the cost of the bond on to you....See MoreAdvice on Medallion kitchen quote and payment?
Comments (17)I work at a Woodmode dealer and that is our standard procedure as well if it is a "drop ship" order (meaning we aren't GC'ing it). Woodmode stands behing the cabinets(and I would think Omega as well - plus any showroom that has been around for a while has a reputation to protect)... if anything is damaged in shipping it usually isn't noticed until later when the cabinets are unwrapped and then we cover it. There would never be enough time for the homeowner to unwrap the cabinets and inspect them while the driver is there (although this may differ from company to company - the Woodmode driver has a busy schedule of deliveries and keeps on moving). If your cabinet shop has been in business a while I would think you have nothing to fear. Think about it like buying a car - you have to pay in full before you leave the lot. If something goes wrong it is covered under your warranty -- very similar to this with cabinetry coming from a manufacturer....See MoreBuilding addition in NJ, what % should the final payment be?
Comments (10)Thank you for that information. I called this office and sure enough there is no such regulation. Unfortunately, we may be stuck on this one. I am very upset, we like his work and want to have good working relationship with him. And here we have a disagreement over the contract terms before the project even started. But here is another question. Is it as bad as it appears to be? In addition to the payment schedule, the contract says exactly this: "If any portion of work remains incomplete only the dollar value amount of the incomplete work may be withheld until that work is completed". The way it was explained to me is, for example, if there are five tiles left undone in a bathroom because we ran out of material, we still have to pay for the tile work except for the five tiles. Of couse not what we want to hear. However, I wonder, if we do sign the contract which includes these terms, is this how we have to interpret it? I would like to interpret it in the above example as "bathroom renovation is not complete" instead of "five tiles not installed". Thanks annab...See MoreHelp! DELAY AFTER DELAY on Lowe's kitchen - Final payment due on CC!
Comments (10)Well, here we sit again....cabinets delayed another week. Have e-mailed Lowe's store manager on 2 weeks ago, again 3 days later re-forwarded the e-mail saying I thought he may have missed it over the 4th holiday and then again one week ago. ZERO RESPONSE. Z-E-R-O! Can't believe how unprofessional this is! I get it people are busy but to just not respond to a customer who has spent $30,000 in your store! And my contract said all work would be done by early April! It is now mid-July and this part of the installation MAYBE will be complete next week, then after countertops are installed (another company) there has to be more measuring for some decorative panels that they suggested we don't measure for until after countertops are in. After a call to Lowe's corporate in which they "escalate" the situation and said the store manager will get this "Urgent Customer Care" email and he must respond within 24 hours....still NO response! UNBELIEVABLE! So have put in another call to Customer Service and now they escalate to the District Manager and I am supposed to hear from him within 24 hours. And by the way, Lowe's Credit Card (Synchrony) said that it just takes a call from a Store Manager and they can push this final payment out and extend the promo (6 months same as cash) on out beyond the original 6 months. I have pretty much done EVERYTHING else myself since I placed the order with no communication from their "install manager" or kitchen designer. I communicate with the installer directly now since the install manager also can't seem to return a phone call or place or follow up on the incorrect orders that keep getting placed. I communicate directly with Schuler (their Customer Service has been phenomenal!) to correct orders that are placed incorrectly---even after going over it several times and putting it in e-mails. Cabinets ordered the wrong size by and inch (at least 5 times), finished ends ordered on the wrong side of the cabinet, etc. Hopefully there is a district manager who can straighten this out and get these people to get this project finished!...See MoreGN Builders L.L.C
4 years agoCharles Ross Homes
4 years agoGN Builders L.L.C
4 years agoUser
4 years agonumbersjunkie
4 years agoroarah
4 years agokudzu9
4 years agolast modified: 4 years agoUser
4 years agolast modified: 4 years agokudzu9
4 years agoCharles Ross Homes
4 years ago
Related Stories
REMODELING GUIDESRemodeling Your Kitchen in Stages: The Schedule
Part 3: See when and how to plan your demo, cabinet work, floor installation and more
Full StoryREMODELING GUIDESHow to Take Care of Your Neighbors When Remodeling
Being communicative, considerate and responsive can help keep the peace in the neighborhood
Full StoryINSIDE HOUZZHow Homeowners Are Paying for Their Remodeling Projects
Cash is still king, but one-third of homeowners pay for renovations with credit cards, Houzz research finds
Full StoryMOST POPULARContractor Tips: Top 10 Home Remodeling Don'ts
Help your home renovation go smoothly and stay on budget with this wise advice from a pro
Full StoryMOST POPULAR8 Little Remodeling Touches That Make a Big Difference
Make your life easier while making your home nicer, with these design details you'll really appreciate
Full StoryINSIDE HOUZZHouzz Survey: See the Latest Benchmarks on Remodeling Costs and More
The annual Houzz & Home survey reveals what you can expect to pay for a renovation project and how long it may take
Full StoryMOST POPULARDecorate With Intention: 12 Remodeling Sanity Savers
When the idealistic visions subside and reality sets in, these tips can help keep your spirits up and your work on track
Full StoryCONTRACTOR TIPSThe 4 Potentially Most Expensive Words in Remodeling
‘While you’re at it’ often results in change orders that quickly add up
Full StoryMOST POPULAR15 Remodeling ‘Uh-Oh’ Moments to Learn From
The road to successful design is paved with disaster stories. What’s yours?
Full StoryFUN HOUZZ31 True Tales of Remodeling Gone Wild
Drugs, sex, excess — the home design industry is rife with stories that will blow your mind, or at least leave you scratching your head
Full StoryColumbus Area's Luxury Design Build Firm | 17x Best of Houzz Winner!
GN Builders L.L.C