SHOP PRODUCTS
Houzz Logo Print
07cooper

Closed on my lot today

07Cooper
7 years ago

So excited I thought I would share. Wish I could start building now but I have not even contacted a designer/draftsman/architect. With mortgage rates so low right now I feel I should be getting on with it but I want to get this house right. The lot has some challenges; small shallow stream cutting halfway across it so septic and well has to be at least 50 feet away and the septic may need a pump depending on the house elevation and the position of the septic. Trying to get the county to give me an idea of what I can/should build to avoid having to put in the more expensive septic system is proving difficult. In the meantime I can get the lot cleared at least. Time to get bids!

Comments (8)