SHOP PRODUCTS
Houzz Logo Print
sammiecanada

Finished finally!

sammiecanada
13 years ago

Our main floor renovations including knocking down the wall between the kitchen & living room are finally done. The contractor said it would take 6 weeks but there was a delay on the cabinets. I had read so much on this forum that helped me a lot so thank you for everyone that shares their information and advice.

flooring: Appalachian maple hardwood, color is toffee

cabinets: custom made maple stained dark burgundy with Lee Valley handles

appliances: Maytag fridge, Electrolux wave touch all gas oven, Electrolux OTR microwave, Miele Optima dishwasher

kitchen: Grohe ladylux 3 faucet; Blanco Supreme U sinks 10" & 7";backsplash midi blanco 8x13;quartz ceasarstone reflections countertops

bathroom: Grohe Tenso faucet, Grohe Relaxa shower, Toto sink, Maax tub; upstairs toilet Toto Aquia III ADA ,downstairs Toto Drake ADA; shower & bathroom wall tile: lino blanco 12x36;floor tile: porcelain silver/grey;Robern mirror/medicine cabinet

furnace/heat pump: Lennox

custom made fireplace mantle

doors: front door Masonite Belleville painted BM Wrought Iron; interior doors Jeld-wen craftsman III; glass basement interior door (which I love) Masonite Matisse, back door has interior built in blinds is Belleville;

Paint: living room BM revere pewter; master bedroom and bathrooms BM gray wisp; 2 spare bedrooms BMw raindance, fireplace mantle & crown molding & doors, BM winter dove

before:[IMG]http://i969.photobucket.com/albums/ae172/sammiecanada/pre%20renovations/kitchenbefore2.jpg[/IMG]

after: [IMG]http://i969.photobucket.com/albums/ae172/sammiecanada/pre%20renovations/Final11.jpg[/IMG]

Here is a link that might be useful: sammiecanada

Comments (44)