I am replacing a service entrance cable and putting the new cable in 1 1/4" schedule 40 conduit. It goes from the meter on the pole down and then 18' underground and back up on the side of the house. Is it code now to use an expansion joint and if so do you need one on both vertical sections? This is in Minnesota. Thank you in advance for your input.