SHOP PRODUCTS
Houzz Logo Print
jill314_gw

Outline of a kitchen remodel - what happens when?

jill314
10 years ago

I have done a lot of thinking about layout, finishes, and so on, but what I remain in the dark about is the overall remodel process. We will likely be hiring a contractor to do most (maybe all) of the work, as we do not really have DIY skills or much time to learn them. So in that sense we don't really need to know what to do next, but still I would like a general sense of what needs to happen and when. Not only because I like to know things, but also so that in the middle of things, I'll have some way of marking progress (and counting down to the finished product!).

So, here are some things that I know have to happen at some point; if someone can put them in order and add what is missing, that would be very helpful!

destruction of whatever is not staying
making structural changes (eg knocking down walls)
plumbing work? like icemaker line if there isn't one, dishwasher line, etc?
electric work? maybe new lighting fixtures?
putting in ductwork to vent range
fixing drywall, subflooring, ceiling (if necessary)
installing cabinets
installing sink & counters
installing faucet
installing dishwasher and range
under-cabinet lighting
painting
flooring (does this go after cabinets go in so they sit on the subflooring?)

Thanks in advance. :)

Comments (9)