mminkous_gw

HELP!!! My tears are falling like rain!!!!

mminkous
15 years ago

Hello all. I need to install engineered wood over slab. Contractor says that floor has high and low spots. I check with my 6' metal level, find some spots within 1/8". Contractor insists that self-leveling is the way to go. I hesitate. Finally I give the green light. Self-leveling is poured. As soon as it's ready for foot traffic, I check with the level again. There are still high and low spots. Some discrepancies as much as 1/4". It seems that the self-leveling is totally unnecessary. I don't know what to do now. Perfect example of "money down the drain." Except this time I wish there were a real drain for the self-leveling stuff to all drain away, and I can work with my not-so-problematic original slab!!

Any advice is appreciated. :(