SHOP PRODUCTS
Houzz Logo Print
loves2cook4six

Emergency Bathroom repair (Long)

11 years ago

Hi folks

I'm an "un"regular/regular over on the cooking forum and received tons of advice from the kitchens forum when we remodeled our kitchen a few years ago. I am cross posting this on the remodeling and kitchen forums as well to get as much help as I can so thanks for your patience.

We were away on vacation for three weeks and came home to a leaky toilet in our master bath. The water damage extends from the floor of the bathroom where the subfloor buckled thus cracking the tiles, down into the ceiling and walls of the first floor under the bathroom and further down into the wall of the basement bathroom.

Our insurance company has sent a water mitigation company out and they are in the process of removing tile in the bathroom, drywall in the bathroom and from the walls and ceilings in the rest of the house that were damaged. They also had to take out our "new" floor under the wet walls on the first floor.

It looks like we will need a new floor for the entire first floor of our house.

I am here for advice. I wasn't planning a bathroom remodel as I actually liked my bathroom 0:). It looks like we will need to retile the entire bathroom as the floor tiles go up the tub surround and up the entire walls of the shower.

I really, really, really don't want this to end up costing us more than the insurance payout but on the other hand this is an opportunity to update the bathroom a little. The only change I would like to make, is to possibly put in a bigger soaking tub as the one we have is a little small and shallow. I think the bigger tub will fit in the same space as there was a fairly large surround.

The old tile was grey but I am thinking of going a very light cream or beige now to match with the rest of our house which is warm colors but the fixtures will stay white. Also we will stain the old cabinets which were pickled pink!!! oak a dark brown color and get a new counter, faucets and sinks which will be on our expense.

What I really need from this forum is advice on what to look out for as they remove and dry up the water and then as we reconstruct the bathroom especially as I have not had enough time to do lots of research.

Then while the ceiling is open in the dining room under the bathroom, I am going to see if dh will let me put in some lighting which we've been talking about for the last oh 10 years or so. The thing is that this room is now used as a dining room by us but it is farther from the kitchen than the living room and so new owners, if we ever sell, would most likely not use it as a dining room but as a living room. What lights should we install? Recessed, chandelier, other?

Finally, I am going to need advice on the floor. We have an engineered wood laminate floor that runs through most of the first floor and the ENTIRE floor is going to need to be replaced. Which actually is not a bad thing because it seems we were ripped off and have had tons of problems with water damage from even as little liquid as a spilled drink which was wiped up immediately. So now I get to choose a new floor and I don't want the same problems. We do however need to choose something that can flow from one room to the next and function well without getting damaged from spills. Advice?

If you've read this epic post - THANK YOU! and i will really appreciate all the help.

Comments (3)