SHOP PRODUCTS
Houzz Logo Print
clemton

$50K for MBR remodel, am I an idiot?

clemton
16 years ago

I think we just bit off more than we can chew and like idiots, jumped too fast and didn't do the logical conservative things, like getting 3 estimates before signing. I'm hoping to find out our contract amt isn't too overboard, although I'm pretty sure it is. We have a large MBR and are having our shower increased to 4"X6" and tiled, a slipper tub with materials cost of $ 4,300, and custom vanity. The $50K does NOT include flooring materials or cost of tile since we are getting those from a friend who owns a flooring store or a vanity countertop which we are getting locally. We live in rural Ohio but our contractor is about 45 miles away. We got him through our interior designer. Any thoughts?

Comments (18)