https://www.houzz.com/ideabooks/125876361/thumbs/kitchen-remodel-under-construction copied to clipboard
https://www.houzz.com/ideabooks/125876361/thumbs/kitchen-remodel-under-construction copied to clipboard
Kitchen Remodel Under Construction
Work in Progress. Plans from different KD's since 2019 or before.
Photo
Colors
Q
Photo
First Draft 8/12/19 - This was the first design by a paid KD. I didnt like the overall lay out, the island location, or the vent hood. She put a pantry on the North wall (near the sink) when I told her I already had a large walk-in pantry.
Q
Photo
Revision 1 8/21/19 - Revised to move the island facing the window. Closer to what I wanted, but found out later the KD mis-keyed the fridge wall measurements, so had to move the fridge to not loose a cabinet I really wanted on that wall.
Q
Photo
5th revision when the KD did what I asked along w/cookbook boxes or wineboxes. This is what I got. I didn't really like this. The fridge wall was to be a breakfast/coffee wall. The fridge took most of that.
Q
Photo
Nov 2019 Final. I finally gave up and told the KD I was done. I told her to put the island back like revision 4, but put all chairs in one line. This is what I got instead.
Q
Photo
The last design I worked on with Traemand (Ikea designers). She fixed a few things that were wrong and we were trying to decide how to work the island and we ran out of time.
Colors
Q