Progress: By my own choice I'm installing all light fixtures and pleased with the results; get it done right besides it's fairly easy for me. Exterior light fixtures done last week. Nothing too fancy but all interior wall sconces installed yesterday; as per DW's order, I left them with bulbs removed and covered with protective bags to prevent dust accumulation from tile work due to start. Next is all ceiling light fixtures before continuing with bathroom lighting.
Family room looking out
Inside master looking out towards foyer and then towards french doors to deck
Another pair outside the master door (had not installed the inside ones yet)
Another one in the foyer
Ready for tile work with wood areas all covered in entire house.