Comments (32)Well, we started May 6, 2009. We were told 9-10 months, and he was right. We should be moving in about a month, but, frankly, I've been holding them up since our original house hasn't yet sold. the idea of 2 mortgages makes me ill and has kept me from being able to get excited about our dream house--that makes me very angry!! Oh well...i have finally ordered tile for the master bath which is one thing I have put off for 2 months-got sick of spending more money than was allotted--finaly bit the bullet. We've had only minor probs, which our GC (for 15%) has handled nicely. Sick of change orders, over-budget, "not in the plans." Ready to sell my old house and move in!! Will try to post pics if i can figure out how!...See MoreIt's February, 2016. How is your build progressing?
Comments (90)Originally, I was told I'd be moving in for the holidays, and I don't mean the upcoming St. Patrick's day -- I knew this wouldn't happen, and there's been a lot of Waiting for Permits / Waiting for Inspections -- which in a small town with a population less than 600 means the town offices have severely limited hours. My broken ankle didn't help matters much either -- during the 3.5 - 4 months of severe down time at my end, I got up there a total of once. However, I've now been there twice in two weeks, yay team. I'd picked out a lot of stuff for the kitchen last summer. Had to jump through hoops to get the kitchen wood-look tile I really really wanted... after ordering about 15 samples of other stuff that when you see it in person, just didn't work out. When I ordered it last December it seemed to have been discontinued, but a call placed to South Cypress found that it had simply been moved to a different "line". I have it, now. I also picked out two quartz countertops from Consentino last summer. They still have the Eco Luna, which I love. However, the Silestone Olive Green is no longer in production. I'm ordering a sample of Silestone Tea Leaf, to see if this works for me. This is it: https://shop.cosentino.com/wp-content/uploads/2013/09/slide_16.jpg The other counter top: http://www.silestoneusa.com/colors/color/luna/ You fine folks here convinced me to go with silgranit sinks. I'm ordering the main sink and the prep sink both in biscotti -- here's the main one: http://www.efaucets.com/detail.asp?product_id=441595 and the prep one: http://www.efaucets.com/detail.asp?Product_Id=441219. (AND you guys convinced me to put in a prep sink....) I do believe my GC is going for the best quality possible. It's just taking forever. This is quality pine backing for my lower kitchen cabinet/drawers, being custom built by GC. GC doesn't understand the whole "drawer" ambiance, but thanks to you folks, I'm pushing for them. Fridge will go to the opening in the left. Counters will be 38" tall, because I'm 6'1". Ceiling vents, not required by code, but helpfully useful none the less....See MoreIt's January 2024, how is your build going?
Comments (98)It's been a hard month. Recently I found out my dad has cancer which has spread through his body and he has several weeks/months to live so our family has been spending alot of time with him. It's strange to be building a house (something you are so excited about) and dealing with something so terrible. So I have been off the grid for awhile. Our tile guy has been working on tiling for last three weeks and takes his time, He's very meticulous about measuring and tile placement, i guess that is good for us. His tile work includes 3 guest bathrooms, laundry room and main master bath. He's almost done with the three guest bathrooms and laundry and will work on master bath next. I had a tile selection remorse after ordering from company called Tilebar. The tile I selected which were to go into the floor for the laundry room and master bath had good reviews. I also got a sample and saw their pictures and thought it would look nice. However when it was installed in the laundry room first (also to go in the master bath floor) and it was not what I expected and looked so different from the pics/sample. After a lot of thought, I decided not to have this tile in my bathroom floor. We have over $2K of this tile left and I decided to eat the cost and get another tile. I can return the tile but after 15% restocking fee and paying for shipping, I don't think there's a lot left. Our cabinets are supposed to come 1st week of Feb. I can't wait for this. We have our interior doors installed, trims done and harwood floors installed....See MoreIt's February 2024, how is your build going?
Comments (80)Here's the timetable we experienced: November 2021 we looked at lots. Saw one we really liked but first contacted a builder and interviewed him (we were looking for a CAPS certified builder, and found one that was also design-build.) The builder asked to see the lot but also another in the same community. He really liked our choice so we made an offer and the sale was finalized February 2022. Meanwhile we started meeting with the builder's designer in December 2021. We saw the initial house plans in February 2022, worked further with the designer, made changes, and signed off on the "scope of work" in April 2022. Some changes were made, electrical diagrams were firmed up, and we had the final plans in June 2022. The designer prepared the application for the HOA architectural review committee and submitted in July 2022. The committee said it was one of the best applications they'd ever seen, and it was approved by late July. This was one of the reasons we loved working with a design-build firm - we didn't have to lift a finger to make that application. Grading began September 2022. Our builder decided to enter the home into the Parade of Homes in October 2023, so the house was basically finished by then. That was good and bad - they really pushed to get it ready in time, but then slowed down a bit afterwards, even though there were still things to be done. But all that's left right now is installing a dehumidifier in the encapsulated crawl space (somehow that was left out originally) and going through our final checklist, and we should take possession in about March. A couple of issues slowed us down, just because of shortages and problems in the building industry. We couldn't get an electrical transformer box for the longest time. They just weren't available. Our builder just called the power company once a week and got to know someone on the other end of the line, meanwhile using generator power. Eventually the insulation subcontractor said he could not work on generator power, and magically our contact at the power company found a transformer. There are people in our community who have been waiting two years for a transformer. Digging the well was the other big delay. All the well-diggers in the western NC area are booked months, in some cases years, ahead. Somehow our builders managed to nab one. Overall we felt the process was really smooth with our builders. The main part of the build took just a year, and after that it was a matter of putting in the driveway and doing minor things. If you've read this far (sorry so long!), you might like to look at our Parade of Homes virtual tour. The house wasn't really quite finished at the time it was photographed. There was no driveway, and there were no shower doors. There was a faulty lighted mirror, and the electrician had reversed the dining room and breakfast nook light fixtures. It's all fixed now! 32- Gateway Mountain Getaway in the WNC Parade of Homes...See MoreRelated Professionals
Enterprise Architects & Building Designers · Franklin Architects & Building Designers · Burlington General Contractors · Centereach General Contractors · Converse General Contractors · Coshocton General Contractors · Delhi General Contractors · Geneva General Contractors · Kilgore General Contractors · Mentor General Contractors · Nashua General Contractors · Pasadena General Contractors · Rossmoor General Contractors · Valle Vista General Contractors · Van Buren General Contractors- last monthlast modified: last month
- last month
- last monthlast modified: last month
- last month
- last month
- last month
- last monthlast modified: last month
- last monthlast modified: last month
- last month
- last month
- last monthlast modified: last month
- last month
- last month
- last month
- last month
- last month
- last month
- last month
- last month
- last month
- 27 days ago
- 27 days agolast modified: 27 days ago
- 27 days agolast modified: 27 days ago
- 26 days ago
- 26 days ago
- 24 days ago
Related Stories

EVENTS2016 Palm Springs Modernism Week Tickets Go on Sale
November 1 is the first day to buy tickets to the February festival celebrating 20th-century architecture and design
Full Story
GREEN BUILDINGGoing Solar at Home: Solar Panel Basics
Save money on electricity and reduce your carbon footprint by installing photovoltaic panels. This guide will help you get started
Full Story
LATEST NEWS FOR PROFESSIONALS15 Lasting Design Ideas From the Best of Houzz 2025 Award Winners
Get ideas for timeless features from popular photos that helped earn pros praise from the Houzz community
Full Story
REMODELING GUIDESSo You Want to Build: 7 Steps to Creating a New Home
Get the house you envision — and even enjoy the process — by following this architect's guide to building a new home
Full Story
BEST OF HOUZZ15 Lasting Design Ideas From the Best of Houzz 2025 Award Winners
Get ideas for timeless features from popular photos that helped earn pros praise from the Houzz community
Full Story
REMODELING GUIDES6 Steps to Planning a Successful Building Project
Put in time on the front end to ensure that your home will match your vision in the end
Full Story
LATEST NEWS FOR PROFESSIONALSDesigners and Builders Share Their Goals for 2025
Find out how home professionals plan to push boundaries, improve communications and even infuse joy into their work
Full Story
MONTHLY HOME CHECKLISTSTo-Dos: Your February Home Checklist
Keep your home fresh and organized this month while you plan for warmer days ahead
Full Story
COLORPantone Is Down With Light Brown for Its 2025 Color of the Year
Meet Mocha Mousse, a soft and comforting milk chocolate hue, and see how to use it inside and outside of a home
Full Story
DATA WATCH10 Kitchen Remodeling Trends to Know About in 2025
See the latest on layouts, design details, spending, pro hiring and more from the 2025 U.S. Houzz Kitchen Trends Study
Full Story
TDinNC