We had a new bathroom built in our primary bedroom. During the design process the plumber walked us through the pipes in the basement. He suggested connecting to an existing line but that it would require a pump/mascerator. We declined that option knowing the maintenance it might require. He found a capped waste line and said he could connect through there. He asked if we had a sewer line inspection and we said yes. They proceeded to connect to it, tested with water and said it looked good. The rest of the bathroom was completed and our contractor didn’t flag any concerns and acted like the job was done asking for final payment.

We showered for the first time and then flushed the toilet (with just tp) and the toilet wouldn’t flush and the shower drain started to bubble up with water. The toilet still isn’t functioning.

Our contractor has given us 3 options to fix this with increasing prices and says the cost is our responsibility.

I would love any and all advice here. Is this fair and typical that the cost is on us for this?

Comments (23)