SHOP PRODUCTS
Houzz Logo Print
msmeow

New sewing room!

last month

It’s still a work in progress, but this is the sewing room in our new home. In the previous house the frame was in a separate room. It’s hard to get good photos from the doorways.


From the bedroom - sewing setup in front of the windows and the frame on the other side. I like it because I am facing the windows at both machines..





Looking the other way, from the foyer:






I’m going to get a cabinet (or two) for fabric storage for the niche behind the ironing board.


Donna

Comments (5)

Sponsored
MAC Design + Build
Average rating: 4.3 out of 5 stars19 Reviews
Loudon County Full-Service Design/Build Firm & Kitchen Remodeler