SHOP PRODUCTS
Houzz Logo Print
joshx9000

What to do with (bad) partially complete concrete driveway job?

Josh
last year

My driveway contractor wants to grind down his newly poured concrete to get rid of these boot marks, pits, and other impressions that his workers made. I do not like the idea of random spots of the driveway being smooth and others having a broomed finish. I also do not like the look of aggregate coming through the top in sections where he grinds it down.


Besides not liking the terribly quality of his work, are there any other reasons to not have it ground down to hide these? I'm very much just wanting it tore up and re-poured.


Any other thoughts on how to deal with this? I have not paid him anything yet. He had 5 trucks so far and has 2/3 left to do. It's a big driveway.








Comments (7)