SHOP PRODUCTS
Houzz Logo Print
ingraldiedson

Question re: timing/logistics of solid wood flooring demo/install

For Edson
last year

Question for those who’ve had solid wood floors laid during a remodel:

We’re having our floors demo’d in the whole downstairs, and then solid wood floors laid.

The wood floors have to acclimate (for a week, I think?)

We need to have the 3 large stacks of new wood floors acclimating while the demo is happening, for timing purposes.

Has anyone experienced this? How does it work, logistically? Do the floor guys demo the room where the wood is acclimating last, so it’s a smaller pile to deal with by the time they come to demo that room?

Thanks!

Comments (2)