SHOP PRODUCTS
Houzz Logo Print
webuser_327447601

Does anyone know? What's a fair price for this?

HU-327447601
2 years ago
last modified: 2 years ago

We think the bill is high, but we want to be fair. We hired an architect for our main floor remodel and he provided us the attached floor plan. Our designer at the time didn't describe the correct layout for the kitchen so it is wrong on the drawing, but I was able to give the measurements to the kitchen designer to redesign it. When it came time to begin, the drawing wasn't what the contractor needed for other spaces so I reached back out to the architect to revise it. However, I never heard back from him so I paid a designer to provide what my contractor needed. 8 months later, the architect came asking for full payment. Since the drawing was incomplete and we had to go pay someone else for what we needed, I don't think that we should owe the full amount. What do you think?


Comments (2)