Project plan for kitchen remodel?

evdryst
8 years ago

Hi there. I need to do everything in my kitchen except move walls (I consider myself lucky in this regard!) - plumbing, electrical work, cabinets, countertops, lights, and soffits need removing/ceiling fixing. I was wondering at what point I can order the cabinets. Since my cabinets go all the way to the ceiling, do I have to basically do everything since I need the ceiling and floor done before I can get an accurate height? And for the floor to be done I need the plumbing done, and might as well do the electrical at the same time. So that is basically everything before I can order?

Lead time for cabs is 7 weeks, plus the time needed to do the plumbing, floor and ceiling. I've heard of people washing their dishes in the bath but I imagine this getting old quickly. Is there any way I can rig a few cabinets up to do some basic cooking? My dining room is adjacent to the kitchen so I have space.

Thanks for any knowledge sharing from the remodel veterans :)

Comments (5)