Here's the continuation of this thread on our Thanksgiving week kitchen remodel. It was getting photo-heavy, so hopefully this will be better.

Okay, we're back on track! We had a good workday on Saturday, and knocked off a few lingering projects.

First, we put in the desk area stuff. We took your earlier advice and pulled the upper cabinet away from the back wall by 6", but that added a lot of complexity in fastening it, as it had to be screwed to the side walls. We had to build up about 1.5" on either side, so we did it with plywood and some shaved-down pieces of a pallet. It looked like this:


We got the wall cabinet screwed in, and the desk placed (at counter height), but not fastened yet, because I can't remember how far from the back wall I told the granite guy to go with the counter. So we'll wait to do the final front-to-back positioning until he brings the slabs back.


I still need to add the fillers and the crown to the wall cabinet, but I'm using the filler around the tambour, and need to use it there first, and use the remnants on the desk.

DH worked for 4 hours on the island electrical. We mused, discussed, and brainstormed to figure out what to do on this. We've got decorative panels everywhere, so an outlet in the middle would detract from that. Plug mold (our original idea) would have required one side of the island counter to be a couple inches more overhand, plus it would cover up the top of the decorative doors. So our KD (thanks, Dan!) had this idea:

It's unobtrusive and simple in concept, but to execute my DH not only had to drill the holes in the precise place in the 3/8" plywood skin, but then chisel out a rectangular area behind it, so the outlet could be flush with the outside of the plywood. Whew! We've got one on either side of the center panel, and the entire island is shown here in the finished shot.


I also did the penninsula trim: more plywood, decorative door panels, and corner bead.

We're waiting by the phone with bated breath for our granite guy to call saying they're ready to bring it. They did send us photos of the template, so we know they've got our slabs. Here's one (sorry, don't know how to make it bigger).

And our backordered drawer handles should finally be here on Monday.

BTW, we're starting demo on our powder room, mud room, laundry room/pantry, and hope to finish by the end of the year. I'm posting the play-by-play on the bathroom forum if you want to follow along.

Comments (29)

Sponsored
Hope Restoration & General Contracting
Average rating: 4.7 out of 5 stars35 Reviews
Columbus Design-Build, Kitchen & Bath Remodeling, Historic Renovations