adding a basement bathroom

hexus
16 years ago

I'm going to be adding a full bathroom in my basement. I know this means cutting the concrete floor to get to the dirt to dig a trench, however I have several questions. How big should the trench be? How big do my drain pipes have to be? Where do I know exactly where to stub them up for the shower and sink? How exactly do I connect to the existing drain pipes once I get to them? What does the slope have to be?

From how I have it laid it out so far the shower and sink are along the same wall. So I was thinking of picking up the shower drain and sink drain in one run and then tieing into the existing drain pipes. Can I do that or would it cause problems to put them both in the same run like that?

I'm more than willing and able to cut and jackhammer up the floor and everything I just don't have the plumbing knowledge to tie everything together.