New Build/HVAC advice?

lryan
12 years ago

I've gotten several quotes on a HVAC for new construction. This is one contractor that has done what I've asked as far as dual fuel, zoning basement off first floor, etc. and doesn't seem to oversize. I will probably upgrade to a 15 seer as I want energy star certification. Please let me know what you think.... (Sq ft-- 1904 basement, 2371 first, 2396 second)

MAIN FLOOR & BASEMENT

1 � TUC1D100A9601A 100,000 BTU Trane 92% Gas Furnace

1 � 4TTB3048D1000 Trane 4 Ton 13 Seer A/C

1 � 4TXCD050BC3HCA Trane 4 Ton Cooling Coil

1 � Zoning Kit

SECOND FLOOR

1 � TUC1C100A9481A 100,000 BTU Trane 92% Gas Furnace

1 � 4TTB3042D1000 Trane 3 � Ton 13 Seer A/C

1 � 4TXCC043BC3HCA Trane 3 � Ton Cooling Coil

We recommend a zoning kit for the bedroom 4 area.

We will install 2 returns on the main level and 6 returns on the second floor and 2 returns in the basement. The trunk line and return boxes will be made of metal with duct wrap. The duct system will be sealed with mastic duct sealer. Flexible duct will be used to make all duct connections to the return boxes, trunk lines and duct boots. Price includes3digital programmable thermostats, A/C pads, emergency drain pans, drain lines and line-sets. Price includes supply registers and filter return grills. Low voltage wiring is included in price. No high voltage wiring is included in price. Price includes gas piping to2 furnaces, 1 water heater, 2 gas logs, and 1stove-top. Price includes venting to 2 furnaces, 1water heaters, 1 hood and 1 dryer and bath fan. Any items not included in this contract will be done on a time and material basis. Permit fees are not included in price.

Thanks!