SHOP PRODUCTS
Houzz Logo Print
bluekitobsessed

Dumb tile question (one in a series) for tile gods & gurus

bluekitobsessed
15 years ago

I have a bathroom with a former tile floor next to a fiberglass-type shower pan. Can I put down a tile/marble floor now and redo the shower (including getting rid of shower pan and tiling shower) later as a Phase II project, or is there some reason it has to all be done at once?

FWIW here's a pic of the former tile floor and shower:

Comment (1)

Sponsored
Haus Studio
Average rating: 4.8 out of 5 stars28 Reviews
Franklin County's Preferred Custom Cabinetry & Design Studio