Hello,

I'm thinking about the logistics of tiling our one bathroom and wondered if anyone had some advice on how to keep the toilet down-time to a minimum. I'm tiling over existing tile, and my plan looks something like this:

Day 1) Rough up existing tile, prime surface, plan layout, pre-cut as many partials as I can;

Day 2) Thinset and lay tile

Day 3) Grout

(I'll seal the grout, caulk, fit the threshold saddle, etc. after that.)

The question of the toilet... I think I can get away with taking it out on Day 2, right before thinset/tile. So:

TOILET DOWN TIME = Time laying tile + thin-set drying time + grout drying time (30 hours?).

Any way I can get those hours down? Fast drying mortar? Install toilet before grout is dry?

I don't want to do a shoddy job, just trying to minimize how much we have to be out of the apt.

Thanks for any tips!

Sam